SMR — Serial Manufacturing Risk Model
v 4.2 · Calibrated against satellite production programs · n = 9
EPSILON3 / SATELLITE MFG
Production DiagnosticDOC. 026 / VARIANCE
Eight satellites this quarter.
Are they actually identical?
Serial manufacturing risk doesn't compound from the units that fail acceptance — it compounds from the ones that pass with quiet variance from the procedure of record. Plug in the production profile. The model returns build-rate slip, unit-to-unit variance from procedure inconsistency, and defense-customer audit exposure. Benchmarked against the satellite manufacturing programs running on Epsilon3. The same diagnostic the discovery call opens with.
SECT. 01
Inputs · Production Profile
CH-01
Active Production Sites
2
MAITE · cleanroom · final integration
1246
CH-02
Weekly Build Rate Target
1.0/ wk
Satellites delivered to acceptance
0.1124
CH-03
Platform Generation
Procedure churn driver
CH-04
Manufacturing Team
280FTE
Authoring · executing · QA
40200500800
CH-05
Defense / Gov Customers
5
Independent audit chains
04812
SECT. 02
Output · Manufacturing Risk Forecast
Build-rate Slip
Production weeks lost per quarter
3.2 wk
Material exposure. Procedure rework and revision-control overhead are eating into delivery cadence.
Unit-to-Unit Procedure Variance
Non-trivial as-built drift across nominally identical units
14%
Above clean serial-production baseline. Rework rate at acceptance is tracking with the variance — not an accident.
Defense Audit Exposure
Quality records/qtr below DoD/MoD traceability standard
340 records
Reconstructed quality records are the single most common finding in defense customer audits at this build rate.
Where the program sits among satellite manufacturing peers
Demo / Tech
1 site · <0.5/wk
Serial Buildout
2 sites · 1–2/wk
Constellation Scale
3+ sites · 2+/wk
Your program
Active Failure Vectors
5 vectors active · ranked by impactThe specific manufacturing risks the model surfaces from the production profile. Each maps to a measurable quality, schedule, or audit cost — and to a place a discovery call typically opens.
Discovery Call · 20 minutes · No deck
Programs at this profile lose 3 weeks of cadence per quarter to procedure variance and rework. The discovery call works through which weeks are already gone this quarter — and which defense audit is most likely to surface them.We come prepared with your model output