Product - Plan

One schedule. Never out of sync.


Every event on the timeline is linked to the exact procedure that runs it — so the schedule always shows what’s actually happening, not what someone thinks is happening.

What changes with Plan

Six ways the schedule stops being a guess.

A scheduled event here isn't a box on a calendar — it's the same event that runs in Build, Test, and Operate, so the plan and the work never fall out of sync.

Every dependency built in, not discovered late.

Draw dependencies directly between events and build trees of interconnected sub-events, so moving one date surfaces everything downstream — automatically, not after someone notices at standup.

  • Dependency builder links events directly, not through a side conversation

  • Downstream impact flagged the moment a date moves

  • Complex operations organized into trees of sub-events and milestones

SEQUENCED, NOT SEPARATE

Deadlines queued, not just tracked.

Queue procedures and tasks against real deadlines and let automatic, augmented scheduling balance resource utilization for you — including recurring maintenance, not only one-off milestones.

  • Automatic scheduling suggestions to maximize resource utilization

  • Recurring and routine maintenance scheduled alongside one-off events

  • Deadlines queued against actual team and equipment availability

QUEUED, NOT GUESSED

Built from procedures you already have.

Schedule against the procedures, events, and operations already in Epsilon3 — no separate planning tool, and nothing to rebuild from scratch every time a program moves into a new phase.

  • Existing procedures scheduled directly, without duplicate entry

  • One system of record from the schedule through the executed step

  • Templates and past schedules reused instead of rebuilt

REUSED, NOT REBUILT

Status you can see, not status you have to ask for.

View the status of every scheduled event at a glance, then drill into run status, resource utilization, and milestones without leaving the timeline.

  • High-level status and step-level detail on the same view

  • Resource utilization visible against the same timeline

  • Updated in real time as procedures run

LIVE, NOT LAGGING

Locked doesn’t mean frozen.

Lock a schedule with configurable review controls, then track every on-the-fly deviation against it — so "the plan changed" always comes with when, why, and who approved it.

  • Configurable controls for single or batched revisions

  • Deviations tracked against the locked baseline, not lost in a thread

  • Full revision history available whenever it’s needed

TRACKED, NOT FORGOTTEN

Everyone’s looking at the same timeline.

Connect Plan to the calendar and communication tools your team already uses, so a schedule change reaches people as a notification, not a missed email.

  • Native integrations with common calendar and messaging tools

  • In-app and email notifications on schedule changes

  • No printed work orders or one-off calls needed to keep people aligned

SYNCED, NOT SEPARATE

01

Plan

Schedule the timeline, dependencies, and resourcing before work starts.

02

Build

Author requirements and procedures, then manufacture and assemble against them.

03

Test

Verify against the same requirements — cases, plans, and results in one thread.

04

Operate

Run procedures and log shift events during live operations.

05

Sustain

Track issues, manage risk, and keep controlled documents in sync — throughout.

Where Plan sits

SCHEDULING THE OPERATIONS THESE TEAMS CAN’T AFFORD TO GET WRONG

See your schedule and the work behind it in the same system.

Bring a timeline you actually run. We’ll show you the dependencies behind it.

Request a demo

See the critical path update live.

A 30-minute walkthrough — schedule a real event live and watch the dependency chain update. Not slides. The system, in prod.

  • A real event, linked to the dependencies that constrain it

  • The schedule updating as the linked procedure runs

  • The critical path it recalculates, traced back to the source