USE CASE - AEROSPACE MANUFACTURERS

A BUILD HISTORY FOR EVERY AIRCRAFT. NOT JUST A SPREADSHEET.


Role-based work instructions for every stage of production, with variant selections, drawing revisions, and as-built changes tracked directly in the execution record — so every aircraft or subsystem has a complete, traceable build history.

WHAT CHANGES FOR AEROSPACE MANUFACTURERS

FROM WORK INSTRUCTION TO CERTIFIED BUILD.

Production, parts, and quality used to live in an MES, an ERP, and a QMS that didn't talk to each other. Here, a work instruction, the part it consumes, and the non-conformance it might trigger are all the same record.

MANUFACTURING EXECUTION & TRACEABILITY

EVERY WORK INSTRUCTION, ROLE-BASED AND READY.

ROLE-BASED WORK INSTRUCTIONS FOR EVERY STAGE OF PRODUCTION.

Digital work instructions replace paper for consistency and quality as you scale, with real-time collaboration between manufacturing and test teams on the same record.

  • Role-based work instructions defined for every stage of production

  • Digital instructions replace paper checklists as production scales

  • Real-time collaboration between manufacturing and test teams

INSTRUCTIONS, BUILT FOR SCALE

PARTS, INVENTORY & PROCUREMENT

A DIGITAL THREAD THAT ACTUALLY HOLDS TOGETHER.

EVERY PART, LOT, AND SERIAL NUMBER IN ONE PLACE.

Control inventory, manage part revisions, and assign lot and serial numbers from a single web-based application — with the Bill of Materials tracked alongside them.

  • Inventory and part revisions managed from one application

  • Lot and serial numbers assigned and tracked automatically

  • Bill of Materials (BOM) tracked against the build it belongs to

PARTS DATA, ONE PLACE

QUALITY, NCR & COMPLIANCE

FROM A FAILED CHECK TO A CLOSED CAPA, ONE RECORD.

A FAILED CHECK PAUSES THE BUILD, AUTOMATICALLY.

Flag any part, product, or process that fails to meet quality or safety requirements, and pause assembly, integration, or test procedures until the issue is resolved.

  • Any part, product, or process can be flagged the moment it fails

  • Assembly, integration, and test procedures pause until resolved

  • A traceable non-conformance report (NCR) documents the essential details

FAILURES, CAUGHT BEFORE THEY PROPAGATE

A TRACEABLE BUILD HISTORY, NOT A PAPER TRAIL.

Variant selections, drawing revisions, and as-built changes are tracked directly in the execution record, so every aircraft or subsystem has a complete, traceable build history.

  • Variant selections and drawing revisions tracked in the execution record

  • As-built changes captured against the exact unit and step

  • Review and version control with approvals, edits, and tracked changes

BUILD HISTORY, COMPLETE BY DEFAULT

PURCHASE ORDERS AND APPROVALS, WITHOUT LEAVING THE PLATFORM.

Receive POs and route procurement approvals in the same system that tracks the parts they cover, on a platform built for controlled, ITAR-compliant aerospace data.

  • Purchase orders received and tracked against inventory

  • Procurement approvals routed alongside the parts they affect

  • ITAR-compliant platform built for controlled aerospace data

PROCUREMENT, TIED TO PARTS

BUILT FOR THE STANDARDS YOU ACTUALLY GET AUDITED AGAINST.

Execute a Corrective and Preventive Action (CAPA) plan tied to the original NCR, on a platform structured to support the certifications aerospace manufacturers are held to.

  • CAPA plans tied directly to the NCR that triggered them

  • Structured to support ISO 9001 and AS9100 quality management standards

  • Built to support FAA and EASA airworthiness and product compliance work

COMPLIANCE, BUILT IN, NOT BOLTED ON

BUILT FOR SPACE; POWERFUL ENOUGH FOR ANY MANUFACTURING OPERATION

SEE YOUR WORK INSTRUCTION AND YOUR NCR IN THE SAME SYSTEM.

BRING A BUILD YOU ACTUALLY RUN. WE’LL SHOW YOU THE TRACEABLE HISTORY IT PRODUCES.

REQUEST A DEMO

SEE THE BUILD HISTORY BUILD ITSELF.

A 30-minute walkthrough — run a real work instruction and watch the traceable build record populate as it happens. Not slides. The system, in prod.

  • A real work instruction, role-based and version-controlled

  • Parts, lots, and serials tracked as they’re consumed

  • An NCR raised and routed to a CAPA, live